below is a window from a vw beetle. looking into the cob home
below: rare back side photo
below: front entrance. green edge on roof is the rainwater collection gutter, just put it
in yesterday. we cut a piece of 3" tubing lengthwise and slipped it around the roofing,
fast and easy and quite practical!
Wednesday, February 25, 2009
Thursday, February 19, 2009
floors
below, hard troweling the final layer of clay/sand with flecks of straw
below, stairs and up have the final layer, notice below, the sub floor
is cracked, this is on purpose to key in the final layer
below, painting a clay slip on the dry floor to adhere the finish coat better
below, final floor with oil and wax finish
below, stairs and up have the final layer, notice below, the sub floor
is cracked, this is on purpose to key in the final layer
below, painting a clay slip on the dry floor to adhere the finish coat better
below, final floor with oil and wax finish